New roof: Prior to installing the new roof, Northcross removed the gravel and
replaced all damaged deck and insulation. New insulation and re-covery board were mechanically attached as a separator
layer and then a 60-mil reinforced TPO assembly from Firestone was
installed. New walkway pads were
installed around all of the service units to protect the membrane.